Electric power generation.
Viesgo is the owner of Los Barrios Thermal Power Plant, located in the municipality of Los Barrios (Cadiz).
The territorial roots through commitment to the environment and the community in which it operates, and the preservation and respect for the environment as elemental axis establishing its management, are the 2 basic principles of Los Barrios Thermal Power Plant.
The plant has an installed capacity of 590 MW.
Project developed in the framework of Complementary Actions for Initiation. Driven by the Chamber of Commerce of Campo de Gibraltar and funded by the European Regional Development Fund.
Cámara Oficial de Comercio, Industria, Servicios y Navegación del Campo de Gibraltar • Paseo de Cornisa s/n. 11204 Algeciras (Cádiz)
t: 956 646 900 • f: 956 646 915 • camara@camaracg.com